Porr UK and Aggregate Industries UK has secured a £260m contract to deliver a modular track system for the High Speed 2 (HS2) project. Credit: Pexels from Pixabay. A consortium of Porr UK and ...
The HS2 track systems have been designed for smooth operations, to run safely at speeds of up to 360km/h and diverging speeds up to 230km/h. Credit: Cory Woodward on Unsplash. HS2 has announced that ...
The UK’s High Speed Two (HS2) has completed the civil engineering phase at the Long Itchington Wood Tunnel in Warwickshire, England, the first deep tunnel on the high-speed route to reach this stage.
Some results have been hidden because they may be inaccessible to you
Show inaccessible results